# Yard to Roof — US Home Improvement & Landscaping Calculators > Free, 100% static, client-side calculators for US landscaping, carpentry and construction > takeoffs. Exact 1/16-inch fractions, IRC code checks, printable cut sheets, and a live SVG > blueprint on every tool. No accounts, no server-side calculation, no data collection. Canonical site: https://yardtoroof.com/ Contact: hello@yardtoroof.com Last reviewed: 2026-11-28 ## Calculators ### Stair Stringer Calculator URL: https://yardtoroof.com/carpentry/stair-stringer-calculator/ Computes: exact riser count, equal unit rise, treads, total run, stringer diagonal, minimum stock board length (8/10/12/14/16/20 ft), remaining throat depth, stringer count at a given OC spacing, and IRC R311.7 code checks. Inputs: total rise (in), target unit rise (default 7.25 in), unit run / tread depth (default 10.5 in), stair width (default 36 in), mount type (dropped or flush top step), tread thickness, stringer board (2x12 or 2x10), stringer spacing (default 16 in OC). Formulas: risers = ceil(total rise / target unit rise) unit rise = total rise / risers treads = risers - 1 total run = treads * unit run diagonal = sqrt(total rise^2 + total run^2) required board = diagonal + 12 in (cut allowance), snapped up to stock length throat = board width - (unit rise * unit run) / sqrt(unit rise^2 + unit run^2) stringers = ceil(stair width / spacing) + 1 Code limits: IRC R311.7.5.1 max riser 7.75 in; R311.7.5.2 min tread 10 in; R311.7.1 min width 36 in; R311.7.8 handrail at 4+ risers; 3.5 in minimum throat, 5 in recommended. ### Baluster Spacing Calculator URL: https://yardtoroof.com/carpentry/baluster-spacing-calculator/ Computes: exact baluster count, clear gap, on-center spacing, end and interior gaps, IRC R312.1.3 4-inch sphere pass/fail, and cumulative leading-edge and centerline tape marks. Inputs: inside opening width (in or ft+in), baluster width (1.5 in 2x2, 0.75 in metal, or custom), maximum clear gap (4.0 in IRC default, 3.5 in, or custom), layout mode (equal gaps or custom end margin), end margin. Formulas (equal gaps): balusters = ceil((opening - max gap) / (max gap + baluster width)) clear gap = (opening - balusters * baluster width) / (balusters + 1) on center = clear gap + baluster width Formulas (custom end margin m): balusters = ceil((opening - 2m + max gap) / (max gap + baluster width)) interior gap = (opening - 2m - balusters * baluster width) / (balusters - 1) Tape marks: leading edge i = end gap + (i-1) * (gap + width); center i = leading edge + width/2. ### Pea Gravel Calculator URL: https://yardtoroof.com/landscaping/pea-gravel-calculator/ Computes: area, volume (cu ft and cu yd), weight (lb and US short tons), 0.5 cu ft bag count, pickup truck loads, and optional cost. Density: 2,700 lb/cu yd (pea gravel); river rock preset 2,600 lb/cu yd. Shapes: rectangle, circle/tree ring, right triangle, direct area. Depth: inches. Waste factor: 0, 5, 10, or 15 percent. ### Gravel Calculator URL: https://yardtoroof.com/landscaping/gravel-calculator/ Computes: driveway and drainage stone volume, tonnage, bag count, and truck loads. Densities: #57 crushed limestone 2,800 lb/cu yd; pea gravel 2,700; river rock 2,600. Default: 4 in depth of #57 over a compacted base. ### Mulch Calculator URL: https://yardtoroof.com/landscaping/mulch-calculator/ Computes: mulch volume, 2 or 3 cu ft bag count, delivered weight, truck loads, optional cost. Densities: hardwood bark 650 lb/cu yd; cedar/pine 500 lb/cu yd; rubber 1,100 lb/cu yd. Default depth: 3 in. ### Shared bulk material formulas rectangle area = length * width circle / ring area = pi/4 * (outer diameter^2 - inner diameter^2) right triangle area = 0.5 * base * height cubic feet = area * (depth in / 12) * (1 + waste/100) cubic yards = cubic feet / 27 weight lb = cubic yards * density lb/cu yd US short tons = weight lb / 2000 bags = ceil(cubic feet / bag size cu ft) pickup loads = cubic yards / 1.75 ## Pillar hubs - Landscaping (live, 3 tools): https://yardtoroof.com/landscaping/ - Carpentry (live, 2 tools): https://yardtoroof.com/carpentry/ - Concrete (planned): https://yardtoroof.com/concrete/ - Fencing (planned): https://yardtoroof.com/fencing/ - Interior (planned): https://yardtoroof.com/interior/ - HVAC & Energy (planned): https://yardtoroof.com/hvac-energy/ ## Reference - Methodology, IRC references, nominal vs. actual lumber, bulk densities, rounding: https://yardtoroof.com/methodology/ - About: https://yardtoroof.com/about/ - Contact and corrections: https://yardtoroof.com/contact/ - Privacy policy: https://yardtoroof.com/privacy-policy/ - Terms of use: https://yardtoroof.com/terms/ ## Conventions - Internal length unit: decimal inches. Displayed fractions are rounded to the nearest 1/16 in with carry-over into whole inches. - Nominal lumber is converted to dressed actual size (2x4 = 1.5 x 3.5 in, 2x10 = 1.5 x 9.25 in, 2x12 = 1.5 x 11.25 in, 4x4 = 3.5 x 3.5 in, 6x6 = 5.5 x 5.5 in). - Riser counts, stringer counts and bag counts round up. Board lengths snap up to stock sizes. - Results are planning estimates, not stamped structural designs. Verify local code amendments. ## Embedding Append ?embed=1 to any calculator URL to render the ad-free, navigation-free widget with a "Powered by Yard to Roof" backlink, for example: https://yardtoroof.com/landscaping/mulch-calculator/?embed=1 Each calculator exposes a copy-ready responsive iframe snippet in its "Embed widget" dialog.